Cooper Lighting

Aurora, Colorado

This project, designed using Autodesk Revit, consists of the interior demo and improvements of an existing building located in Aurora, Colorado to LEED, Class A Office standards.  Proposed improvements include new exterior windows with wall demo, new office build-out, and a new mezzanine and consists of two phases—Phase One – Demo, Mezzanine Structure, Stairways, Window openings and  passenger  elevator;   and   Phase  Two — Interior  office  and  warehouse  improvements.  Specific scope of work items include interior demolition, wall  saw  cutting  and demolition, structural steel, reinforcing steel, millwork, roof patching, skylights, caulking, insulation, doors/frames and hardware, glass/glazing, steel studs, drywall, finish flooring, acoustical ceilings, painting, toilet accessories/partitions, window blinds, operable partition, elevator,  plumbing,  fire  protection, mechanical HVAC and electrical.